On September 3, 2026, at 9:00 a.m., the Building Materials Manufacturing Department at the South Plant Area of CGPC Main Plant conducted a solar panel fire emergency response drill under its Business Continuity Plan (BCP). The drill involved the Building Materials Manufacturing Department, Processing Department, and relevant support units.
The drill subjects included plant-wide fire reporting, power isolation, personnel evacuation, collaborative disaster response, casualty first aid, material transport, and simulated fire engine arrival scenarios. Through hands-on operation and post-drill reviews, the exercise strengthened cross-departmental emergency response capabilities to ensure overall personnel and plant safety.